Project Gallery : Structures

Location:Sedro Woolley, WA
Project Dates:2006-2007
Owner:Skagit County
Status:Complete
Project Details:

Strider rebuilt 6,800 feet of Helmick Road and installed a 150 ft span concrete bridge over Red Creek for Skagit County in their effort to improve access to the Upper Skagit Reservation.  Several major cuts and fills were made to create the new road alignment.  As part of the project a 96” CMP was installed and several new stream channels were constructed as a mitigation effort to introduce aquatic life to the area.  This project also included constructing a new turn lane on Highway 20 with illumination system, storm drainage system, curb and gutter, paving, stripping, permanent signage, guardrail, and walking trails.