Project Gallery : Structures

Location:Lynnwood, WA
Project Dates:2009
Owner:Snohomish County Public Works
Status:Complete
Project Details:

This project involved replacing the existing wood bridge on Ash Way with a new precast concrete bridge.  As part of the bridge replacement, new utilities were installed and the roadway was widened.  Stream channel improvements and significant wetland enhancements were performed.  The new bridge consisted of a large precast box culvert founded on steel piling with an aesthetically appealing cast-in-place guardrail system.